| Structural Element for Building 2 |
| Bldg Type |
RES HANGAR |
| Exterior Wall 1 |
CONCRETE BLOCK STUCCO |
| Year Built |
2026 |
| Air Condition Desc. |
NA |
| Heat Type |
FORCED AIR DUCT |
| Heat Fuel |
NONE |
| Bed Rooms |
|
| Full Baths |
|
| Half Baths |
1 |
| Roof Structure |
WOOD JOISTS, WOOD/COMPOSI |
| Roof Cover |
CEMENT FIBER SHINGLES |
| Interior Wall 1 |
HANGAR |
| Interior Wall 2 |
NONE |
| Floor Type 1 |
CONCRETE |
| Stories |
1 |
| Subarea and Square Footage for Building 2 |
| Code Description |
square Footage |
| BAS Base Area |
4410 |
| OFF Office |
390 |
| FCA Finished Covered Area |
1206 |
| Total Square Footage |
6006 |
| Area Under Air |
390 |
|
| Sketch for Building 2 |
|
|